QUALITY IMPROVEMENT ON PIPE DEFECTS AT WELDING ERECTION PROCESS
DOI:
https://doi.org/10.70672/1xzp6026Keywords:
Lean Six Sigma; Improvement; P; (List ipe Defects; Welding Erection Process; DMAIC.Abstract
The project was carried out at Aldats (Malaysia) Sdn. Bhd., located in Bandar Baru Seri Alam, Masai Johor. Aldats (Malaysia) Sdn. Bhd. offered three main services which are Engineering and Construction, Manpower Supply and Trading. Current pipe defect at engineering and construction services is 40% which in September 2022. The aim of this project is to reduce pipe defect at welding erection process by at least 20%. After the quality improvement by implement DMAIC, the result shows a decreasing to 27% in December 2022.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Malaysian Journal of Industrial Technology

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Journal of Engineering Technology (JET) is an open-access journal that follows the Creative Commons Attribution-Non-commercial 4.0 International License (CC BY-NC 4.0)



